Nivel de Detalle (LOD) en la Gestión de Modelos BIM: Precisión y Eficiencia en Proyectos de Construcción en El Salvador
| dc.contributor.advisor | Portillo Torres Walter Balbino | |
| dc.contributor.author | Orellana Hernandez, Elisa Nohemy | |
| dc.contributor.author | Vásquez Madrid, Maybelline Melissa | |
| dc.contributor.author | Vega Canales, Anthony Adams | |
| dc.contributor.other | Oh19017@ues.edu.sv | |
| dc.contributor.other | Vm13035@ues.edu.sv | |
| dc.contributor.other | Vc18004@ues.edu.sv | |
| dc.date.accessioned | 2025-11-19T15:31:24Z | |
| dc.date.available | 2025-11-19T15:31:24Z | |
| dc.date.issued | 2025-10 | |
| dc.description.abstract | RESUMEN: La implementación de la metodología Building Information Modeling (BIM) en la gestión de proyectos de construcción ofrece numerosos beneficios, ya que permite desarrollar tareas de manera más eficiente y óptima. En la actualidad, BIM se considera una herramienta esencial para estudiantes y profesionales de arquitectura, al facilitar el diseño y gestión de proyectos reales durante su ciclo de vida, reduciendo costos y mejorando el control y la supervisión de las obras. Dentro de esta metodología, la especificación del Nivel de Desarrollo (LOD), establecida por el American Institute of Architects (AIA), constituye una referencia fundamental para mejorar la comunicación entre los usuarios de modelos BIM, al definir el grado de detalle y precisión que debe tener cada elemento del modelo tridimensional. El presente artículo tiene como objetivo analizar cómo el uso del LOD en entornos BIM contribuye al desarrollo progresivo de modelos precisos, coordinados y funcionales, resaltando su impacto en las distintas etapas del proyecto y su valor como herramienta integral de gestión. La investigación se desarrolló bajo un enfoque cualitativo y descriptivo, mediante la revisión bibliográfica de fuentes académicas, normativas internacionales (AIA y BIMForum) y estudios de caso locales e internacionales, con el fin de determinar el grado de adopción del LOD en El Salvador. Durante el desarrollo de este estudio se identificaron algunas limitaciones que deben considerarse al interpretar los resultados. El análisis se centró principalmente en fuentes teóricas y documentales basadas en contextos internacionales, sin una aplicación directa en proyectos nacionales, lo que restringe la validación empírica de los beneficios y desafíos del LOD dentro del entorno constructivo salvadoreños. ABSTRACT: The implementation of the BIM methodology in construction project management offers numerous benefits, as it allows tasks to be developed more efficiently and effectively. Currently, BIM is considered an essential tool for architecture students and professionals, as it facilitates the design and management of real projects throughout their life cycle, reducing costs while improving control and supervision on site. Within this methodology, the Level of Development (LOD) specification, established by the American Institute of Architects (AIA), serves as a fundamental reference to enhance communication among BIM model users by defining the degree of detail and accuracy required for each model element. This article aims to analyze how the use of LOD within BIM environments contributes to the progressive development of accurate, coordinated, and functional models, emphasizing its impact across different project stages and its value as an integrated management tool. The research adopted a qualitative and descriptive approach, based on a bibliographic review of academic sources, international standards (AIA and BIMForum), and national and international case studies to determine the degree of LOD adoption in El Salvador. During the course of this study, several limitations were identified that should be considered when interpreting the results. The analysis focused primarily on theoretical and documentary sources from international contexts, without direct application in local projects. Consequently, this restricts the empirical validation of the LOD’s benefits and challenges within the Salvadoran construction environment. | |
| dc.identifier.uri | https://hdl.handle.net/20.500.14492/32507 | |
| dc.language.iso | es | |
| dc.publisher | Universidad de El Salvador | |
| dc.subject | Modelado | |
| dc.subject | Detalle | |
| dc.subject | Precisión | |
| dc.subject | Eficiencia | |
| dc.subject | Construcción. | |
| dc.title | Nivel de Detalle (LOD) en la Gestión de Modelos BIM: Precisión y Eficiencia en Proyectos de Construcción en El Salvador | |
| dc.type | Trabajo de grado |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Nivel de Detalle (LOD) en la Gestión de Modelos BIM Precisión y Eficiencia en Proyectos de Construcción en El Salvador.pdf
- Size:
- 1.09 MB
- Format:
- Adobe Portable Document Format